1. Ensure the availability of raw material in the plant in a timely manner.
2. Negotiate charges for raw material delivery failures with suppliers.
3. Properly control excess and obsolete inventories.
4. Timely coordinate engineering and model changes to have raw material on time in the plant.
5. Minimize premium based on timely problem identification.