Program Manager, Data Center Construction, Environmental Health and Safety

2 Days ago • 5-15 Years • Facilities Management

About the job

Job Description

This role is a Program Manager, Data Center Construction, Environmental Health and Safety at Google. Responsibilities include EHS management and oversight within the MARCUS framework at operational data centers; working with contractors, trades organizations, and integrators to improve EHS performance; pre-qualification evaluations of vendors; project planning, tracking, risk mitigation, and on-time delivery; and serving as an interface to process excellence and IT teams. The ideal candidate will have a Bachelor's degree in a related field and 5+ years of experience in program/project management, EHS management, and working with data center technical teams. Preferred qualifications include experience with electrical safety standards (e.g., NEN-EN 50110, NEN3140, NFPA 70E) and implementing EHS needs in data center design.
Must have:
  • Bachelor's degree in relevant field
  • 5+ years program/project management experience
  • 5+ years EHS management experience
  • 5+ years experience with data center technical teams
  • EHS management and oversight
  • Collaboration with contractors and integrators
  • Project planning, tracking, risk mitigation
Good to have:
  • Experience with electrical safety standards (NEN-EN 50110, NEN3140, NFPA 70E)
  • Implementing EHS needs in data center design
  • Knowledge of data center operations, facilities management, engineering, and construction
Not hearing back from companies?
Unlock the secrets to a successful job application and accelerate your journey to your next opportunity.

Minimum qualifications:

  • Bachelor's degree in Civil, Electrical, Mechanical, or Industrial Engineering, EHS, Architecture, Construction management, a related field, or equivalent practical experience.
  • 5 years of experience in program or project management.
  • 5 years of experience in Environmental, Health and Safety management.
  • 5 years of experience with technical teams responsible for project management, engineering, and construction of data centers.

Preferred qualifications:

  • Experience with Electrical Safety in the Workplace such as the EU standards NEN-EN 50110, NEN3140, and US NFPA 70E standards.
  • Experience implementing EHS needs in the design of data centers.
  • Knowledge of data center operations, facilities management, engineering, and construction.
  • Knowledge of data center structural, electrical, mechanical, and controls equipment.
  • Ability to strategically think and analyze the needs of clients while being deadline and detail-oriented.
  • Excellent problem-solving, communication, and facilitation skills.

About the job

A problem isn’t truly solved until it’s solved for all. That’s why Googlers build products that help create opportunities for everyone, whether down the street or across the globe. As a Technical Program Manager at Google, you’ll use your technical expertise to lead complex, multi-disciplinary projects from start to finish. You’ll work with stakeholders to plan requirements, identify risks, manage project schedules, and communicate clearly with cross-functional partners across the company. You're equally comfortable explaining your team's analyses and recommendations to executives as you are discussing the technical tradeoffs in product development with engineers.

Our goal is to build a Google that looks like the world around us — and we want Googlers to stay and grow when they join us. As part of our efforts to build a Google for everyone, we build diversity, equity, and inclusion into our work and we aim to cultivate a sense of belonging throughout the company.

Google Cloud accelerates every organization’s ability to digitally transform its business and industry. We deliver enterprise-grade solutions that leverage Google’s cutting-edge technology, and tools that help developers build more sustainably. Customers in more than 200 countries and territories turn to Google Cloud as their trusted partner to enable growth and solve their most critical business problems.

Responsibilities

  • Be responsible for Environmental Health and Safety (EHS) management and oversight within the Moves, Adds, Retrofits, Changes, Utilities, Security (MARCUS) framework at operational data centers.
  • Work directly with general contractors, electrical/mechanical trades and organizations, key integrators, fabricators, and commissioning agents to improve our EHS performance on our construction projects.
  • Engage in pre-qualification evaluations of potential vendors, update the project manual, and communicate quality standards and EHS expectations. Be involved in project planning/tracking, risk mitigation, and on-time delivery.
  • Serve as an interface to the process excellence and information technology teams who will depend on your project portfolio for best practices, establishing data feeds, fashioning metrics, and capturing lessons learned to help the organization scale efficiently.
View Full Job Description

Add your resume

80%

Upload your resume, increase your shortlisting chances by 80%

About The Company

A problem isn't truly solved until it's solved for all. Googlers build products that help create opportunities for everyone, whether down the street or across the globe. Bring your insight, imagination and a healthy disregard for the impossible. Bring everything that makes you unique. Together, we can build for everyone.

View All Jobs

Get notified when new jobs are added by Google

Similar Jobs

Axinous - Senior Treasury Analyst

Axinous, United States (Hybrid)

The Pokemon Company International - Sr. Program Manager - People Programs

The Pokemon Company International, United States (Hybrid)

Wipro - ITIL Release Manager

Wipro, India (On-Site)

Maersk Careers - Operations Head Fulfillment

Maersk Careers, India (On-Site)

Mattel  Inc  - 1st Shift Warehouse Supervisor

Mattel Inc , United States (On-Site)

Buckman - Customer Delivery Technician

Buckman, United States (On-Site)

Cloud Imperium Games - Workplace Operations Specialist

Cloud Imperium Games, United Kingdom (On-Site)

Get notifed when new similar jobs are uploaded

Similar Skill Jobs

Luxoft - Senior Cyber Security Risk Analyst

Luxoft, Mexico (Remote)

Luxoft - Business Analyst - Treasury

Luxoft, India (On-Site)

Intel Corporation - HR Compliance Manager

Intel Corporation, United States (Hybrid)

Take-Two Interactive - Health and Safety Manager

Take-Two Interactive, United Kingdom (On-Site)

Social Discovery Group - VP of Legal & Compliance

Social Discovery Group, Spain (Remote)

Paradoxum Games - Game Producer

Paradoxum Games, United States (On-Site)

Fluence - Vice President Risk Management

Fluence, United States (Hybrid)

Fluence - Vice President Risk Management

Fluence, United States (Hybrid)

One97 Communications  - Data Science - Lead Data Scientist

One97 Communications , India (On-Site)

Get notifed when new similar jobs are uploaded

Facilities Management Jobs

Trendyol - Hemşire - Ankara

Trendyol, Türkiye (Hybrid)

Activate Games - Store Leader (Store Manager)

Activate Games, United States (On-Site)

Sandbox VR - Retail Associate (Seasonal)

Sandbox VR, United States (On-Site)

Playrix - Office manager (Astana, Kazakhstan)

Playrix, Ireland (On-Site)

Mattel  Inc  - Warehouse Supervisor - DTC Operations

Mattel Inc , United States (On-Site)

Company3 Method Studios - Facility Technician x2

Company3 Method Studios, United States (On-Site)

Axon - Arizona Facilities Manager (Onsite)

Axon, United States (On-Site)

The Walt Disney Company - Safety Professional

The Walt Disney Company, United States (On-Site)

Get notifed when new similar jobs are uploaded