About the job
SummaryBy Outscal
PLM Executive with 1-3 years of experience in textile/apparel industry, proficient in PLM, Excel, and data validation, responsible for fabric, trim, and goldseal creation and updates, style code management, and product modification in PLM system.
About the job
Base Location: Bangalore
Minimum Qualification: Graduate and Above
Preferred Years of Experience: 1-3years
Preferred Skills: Textile / apparel background
Key Result Areas
Fabric creation
- Validation of input data template
- Verification of creation in PLM
- Error handling and communication of task completion and fabric codes to Designer. Download template and send as proof.
Fabric update
- Validation of input data template
- Verification of data updating in PLM
- Error handling and communication of task completion to Sourcing user. Download template and send as proof.
Trim creation
- Validation of input data template
- Verification of creation in PLM
- Error handling and communication of task completion, trim codes to designer. Download template and send as proof.
Trim update
- Validation of input data template
- Verification of data updating in PLM
- Error handling and communication of task completion to Sourcing user. Download template and send as proof.
Goldseal creation
- Creation of goldseal as per designer input
- Updating of image as provided by designer.
- Communication of goldseal created to designer along with tech pack.
Style code creation
- Upload of style explosion template as provided by design team.
- Error handling and communication with designer and sourcing team for error rectification
- Communication of style codes to designer.
Fabric color change
- Carryout color change as per designer request
- Send proof of change (revised fabric indent) to designer
Goldseal sketch Correction
- Replace existing sketch with new sketch provided by designer.
- Send revised tech pack as proof of change.
Image upload to Style code
- Upload images at style code level as requested by design team.
Product modification / Upload
- Validate template sent by product team for correctness.
- Upload template and verify updating in system.
- Error handling and communication of task completion to product team.
- Download Template and send as proof of updating.
BOM upload
- Validate input Bom template from product team.
- Upload template and verify system updating.
- Download template and send as proof to product team.
Costing upload
- Validate input costing template from product team.
- Upload template and verify system updating.
- Download template and send as proof to product team Validation in SAP for Style and BOM flow.
- For BOM upload and activation in SAP – need to co-ordinate with fabric and trim sourcing trims for Follow up if there is development complete pending.
- Style code Activation – After updating all data in PLM and data flow need to verify whether all style codes flown to SAP or not. If not, then same deep dive for reasons
- BOM – Need to check whether is it flown to SAP or not. If not get it checked what is the error.
PLM Consulting,Excel